Centrale nucleare în România — reactor-level list of nuclear power plant units from the GeoNuclearData database (WNA/IAEA-sourced), including shutdown and under-construction units with reactor type/model, construction and operational dates, and capacity (MW). Complements the power-plants datasets (which cover operating plants of all fuels, plant-level): this list is reactor-unit level and includes historical (shutdown) and future (under construction) units. Names are ASCII/English as published by the source; native-script names not in source. Snapshot at source commit date (2024-era database; per-record LastUpdatedAt varies). Conține 5 înregistrări. Descarcă în format Excel, CSV, PDF.
📥 Descărcare gratuită
💡 Puncte cheie
- Conține 5 înregistrări / 12 câmpuri
- Descărcare gratuită în format Excel, CSV și PDF
- Sursa datelor: open data
📋 ข้อมูลทั้งหมด
Afișate 5
din 5
| Name | Latitude | Longitude | Status | Reactor Type | Reactor Model | Construction Start | Operational From | Operational To | Capacity Mw | Iaea Id | Data Source |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Cernavoda-1 | 44.322 | 28.061 | Operational | PHWR | CANDU 6 | 1983-03-31 | 1996-12-02 | 650 | 442 | WNA/IAEA | |
| Cernavoda-2 | 44.322 | 28.061 | Operational | PHWR | CANDU 6 | 1983-07-01 | 2007-11-01 | 650 | 443 | WNA/IAEA | |
| Cernavoda-3 | 44.322 | 28.061 | Suspended Construction | PHWR | 1984-02-09 | 655 | WNA/IAEA/Wikipedia | ||||
| Cernavoda-4 | 44.322 | 28.061 | Suspended Construction | PHWR | 1985-08-15 | 655 | IAEA/Wikipedia | ||||
| Cernavoda-5 | 44.322 | 28.061 | Cancelled Construction | PHWR | 1987-05-12 | 655 | IAEA/Wikipedia |